Yeong-Dae Kim




  • Department of Industrial Engineering
  • Korea Advanced Institute of Science and Technology (KAIST)
  • Yusong-gu, Daejon 305-701
  • Korea
  • Tel: +82-42-350-3120
  • Fax: +82-42-350-3110
  • E-mail: ydkim@kaist.ac.kr
  • Education

    Work Experience

    Affiliations

    Research Interests

    Research Papers

    Refereed journal articles (International, non-Korean)

      Papers in Journals included in SCIE

    1. Dong-Hoon Lee, Bong-Joo Jeong, Bong-Kyun Kim, Ju-Yong Lee, Sebong Jang, and Y-D. Kim, 2016. Algorithms for aircraft flight and maintenance scheduling in an army aviation unit. Military Operations Research Journal. Vol. 21, No. 3, pp. 5-17. doi: 10.5711/1082598321305 [Abstract]
    2. Young-Jin An, Y-D. Kim, and Seong-Woo Choi, 2016. Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times.Computers and Operations Research Vol. 71, pp. 127-136. doi:10.1016/j.cor.2016.01.017 [Abstract]
    3. Jun-Hee Han and Y-D. Kim, 2016. Design and operation of a two-level supply chain for production-time-dependent products using Lagrangian relaxation. Computers and Industrial Engineering Vol.96. pp. 118-125. doi:10.1016/j.cie.2016.03.018 [Abstract]
    4. Ju-Yong Lee and Y-D. Kim, 2015. A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint. Journal of the Operations Research Society Vol. 66, No. 10, pp. 1542-1554. doi:10.1057/jors.2014.122 [Abstract]
    5. Kyung-Yeol Bae, Y-D. Kim, and Jun-Hee Han, 2015. Finding a risk-constrained shortest path for an unmanned combat vehicle. Computers and Industrial Engineering Vol. 80, pp. 245-253. doi: 10.1016/j.cie.2014.12.016 [Abstract]
    6. BongJoo Jeong and Y-D. Kim, 2014. Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times. Computers and Operations Research Vol. 47, pp. 72-80. doi: 10.1016/j.cor.2014.02.002 [Abstract]
    7. Du-Hyun Han, Y-D. Kim, and Ju-Yong Lee 2014. Multiple-criterion Shortest Path Algorithms for Global Path Planning of Unmanned Combat Vehicles. Computers and Industrial Engineering Vol. 71, pp. 57-69. doi: 10.1016/j.cor.2014.02.002 [Abstract]
    8. Dong-Guen Kim and Y-D. Kim, 2013. A Lagrangian heuristic algorithm for a public healthcare facility location problem. Annals of Operations Research Vol. 206, pp. 221-240. doi: 10.1007/s10479-013-1378-4 [Abstract]
    9. Young-Jin An, Y-D. Kim, BongJoo Jeong, and Seung-Dae Kim, 2012. Scheduling healthcare services in a home healthcare system. Journal of the Operational Research Society Vol. 63, No. 11, pp. 1589-1599. doi:10.1057/jors.2011.153 [Abstract]
    10. Ju-Yong Lee and Y-D. Kim, 2012. Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance. Computers and Operations Research Vol. 39, No. 9, pp. 2196-2205. doi: 10.1016/j.cor.2011.11.002 [Abstract]
    11. Chul-Hwan Park, Y-D. Kim, BongJoo Jeong, 2012. Heuristics for determining a patrol path of an unmanned combat vehicle. Computers and Industrial Engineering Vol. 63, No. 1, pp. 150-160. doi: 10.1016/j.cie.2012.02.007 [Abstract]
    12. June-Young Bang, Y-D. Kim, Seong-Woo Choi, 2012. Multi-product lot merging/splitting algorithms for semiconductor wafer fabrication. IEEE Transactions on Semiconductor Manufacturing Vol. 25, No. 2, pp. 200-210. doi: 10.1109/TSM.2012.2189784 [Abstract]
    13. Jae-Hun Kang and Y-D. Kim, 2012. Inventory Control in a Two-Level Supply Chain with Risk Pooling Effect. International Journal of Production Economics Vol. 135, No. 1, pp. 116-124. doi: 10.1016/j.ijpe.2010.11.014 [Abstract]
    14. Bong-Kyun Kim and Y-D. Kim, 2011. Heuristic algorithms for assigning and scheduling flight missions in a military aviation unit. Computers and Industrial Engineering. Vol. 61, No. 4, pp. 1309-1317. doi:10.1016/j.cie.2011.08.004 [Abstract]
    15. June-Young Bang and Y-D. Kim, 2011. Scheduling algorithms for a semiconductor probing facility. Computers and Operations Research Vol. 38, No. 3, pp. 666-673. doi:10.1016/j.cor.2010.08.010 [Abstract]
    16. Y-D. Kim, Jae-Hun Kang, Gyeong-Eun Lee, and Seung-Kil Lim, 2011. Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System. IEEE Transactions on Semiconductor Manufacturing Vol. 24, No. 1, pp. 14-26. [Abstract]
    17. Yong-Chan Choi, Y-D. Kim, and June-Young Bang, 2010. Scheduling Algorithms for an Air Conditioner Manufacturing System Composed of Multiple Parallel Assembly Lines. International Journal of Advanced Manufacturing Technology Vol. 51, Nos. 9-12, pp. 1225-1241. doi:10.1007/s00170-010-2692-5 [Abstract]
    18. Young-Ho Cha and Y-D. Kim, 2010. Fire Scheduling for Planned Artillery Attack Operations under Time-Dependent Destruction Probabilities. Omega Vol. 38, No. 5, pp. 383-392. doi:10.1016/j.omega.2009.10.003 [Abstract]
    19. Dong-Guen Kim and Y-D. Kim, 2010. A branch and bound algorithm for determining locations of long-term care facilities. European Journal of Operational Research Vol. 206, No. 1, pp. 168-177. doi:10.1016/j.ejor.2010.02.001 [Abstract]
    20. Y-D. Kim, Byung-Jun Joo, and So-Young Choi 2010. Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility. IEEE Transactions on Semiconductor Manufacturing Vol. 23, No. 2, pp. 246-254. doi:10.1109/TSM.2010.2045666 [Abstract]
    21. Jae-Hun Kang and Y-D. Kim, 2010. Inventory Replenishment and Delivery Planning in a Two-Level Supply Chain with Compound Poisson Demands. International Journal of Advanced Manufacturing Technology Vol. 49, Nos. 9-12, pp. 1107-1118. doi 10.1007/s00170-009-2468-y [Abstract]
    22. June-Young Bang and Y-D. Kim, 2010. Hierarchical production planning for semiconductor wafer fabrication based on linear programming and discrete-event simulation. IEEE Transactions on Automation Science and Engineering Vol. 7, No. 2, pp. 326-336. doi:10.1109/TASE.2009.2021462 [Abstract]
    23. Truong Ton Hien Duc, Huynh Trung Luong, and Y-D. Kim, 2010. Effect of the third-party warehouse on bullwhip effect and inventory cost in supply chains. International Journal of Production Economics Vol. 124, No. 2, pp. 395-407. doi:10.1016/j.ijpe.2009.11.036 [Abstract]
    24. Jae-Hun Kang and Y-D. Kim, 2010. Coordination of inventory and transportation managements in a two-level supply chain. International Journal of Production Economics Vol. 123, No. 1, pp. 137-145. doi:10.1016/j.ijpe.2009.07.008 [Abstract]
    25. Seong-Woo Choi and Y-D. Kim, 2009. Minimizing total tardiness on a two-machine re-entrant flowshop. European Journal of Operational Research Vol.199, No. 2, pp. 375-384. doi:10.1016/j.ejor.2008.11.037 [Abstract]
    26. Mi Lim Lee, Jae-Gon Kim, and Y-D. Kim, 2009. Linear programming and Lagrangian relaxation heuristics for designing a material network on a block layout. International Journal of Production Research Vol. 47, No. 18, pp. 5185-5202. doi:10.1080/00207540802050852 [Abstract]
    27. Byung-Jun Joo and Y-D. Kim, 2009. A branch and bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints. Journal of the Operational Research Society Vol. 60, No. 4, pp. 572-582. doi:10.1057/palgrave.jors.2602598 [Abstract]
    28. Y-D. Kim, Byung-Jun Joo and Jong-Ho Shin, 2009. Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint. Journal of Heuristics Vol. 15, No. 1, pp. 19-42. DOI 10.1007/s10732-007-9061-z [Abstract]
    29. Truong Ton Hien Duc, Huynh Trung Luong, and Y-D. Kim, 2008. A measure of bullwhip effect in supply chains with stochastic lead time. International Journal of Advanced Manufacturing Technology Vol. 38, No. 11-12, pp. 1201-1212. [Abstract]
    30. Ho-Joo Lee, Y-D. Kim, and Sang-Beom Lee, 2008. A simulation-based heuristic algorithm for disposition of direction finders. Computers and Indutrial Engineering Vol. 55, No. 1, pp. 134-149. [Abstract]
    31. Y-D. Kim, June-Young Bang, Kwee-Yeon An, and Seung-Kil Lim, 2008. A due-date based algorithm for lot-order assignment in a semiconductor wafer fabrication facility. IEEE Transactions on Semiconductor Manufacturing. Vol. 21, No. 2, pp. 209-216. [Abstract]
    32. Truong Ton Hien Duc, Huynh Trung Luong, and Y-D. Kim, 2008. A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process. European Journal of Operational Research Vol. 187, No. 1, pp. 243-256. [Abstract]
    33. Seong-Woo Choi and Y-D. Kim, 2008. Minimizing makespan on an m-machine re-entrant flowshop. Computers and Operations Research Vol. 35, No. 5, pp. 1684-1696. [Abstract]
    34. Sang-Oh Shim and Y-D. Kim, 2008. A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property. Computes and Operations Research Vol. 35, No. 3, pp. 863-875. [Abstract]
    35. Ho-Joo Lee and Y-D. Kim, 2008. An analytical method for three-dimensional location estimation using directional data. Engineering Optimization Vol. 40, No. 1, pp. 17-32. [Abstract]
    36. Seong-Woo Choi and Y-D. Kim, 2007. Minimizing makespan on a two-machine re-entrant flowshop. Journal of the Operational Research Society Vol. 58, No. 7, pp. 972-981. [Abstract]
    37. Ho-Joo Lee and Y-D. Kim, 2007. Heuristics for Search Sequencing under Time-dependent Probabilities of Existence. Computers and Operations Research Vol. 34, No. 7, pp. 2010-2024. [Abstract]
    38. Byung-Jun Joo and Y-D. Kim, 2007. An optimal solution algorithm for a batch-processing machine scheduling problem with a product-mix ratio constraint. International Journal of Industrial Engineering Vol. 14, No. 2, pp. 198-202. [Abstract]
    39. Sang-Oh Shim and Y-D. Kim, 2007. Minimizing total tardiness in an unrelated parallel-machine scheduling problem. Journal of the Operational Research Society. Vol. 58, No. 3, pp. 346-354. [Abstract]
    40. Sang-Oh Shim and Y-D. Kim, 2007. Scheduling on parallel identical machines to minimize total tardiness. European Journal of Operational Research Vol. 177, No. 1, pp. 135-146. [Abstract]
    41. Seong-Woo Choi, Y-D. Kim, and Geun-Cheol Lee, 2005. Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop. International Journal of Production Research Vol. 43, No. 11, pp. 2049-2067. [Abstract]
    42. Hwa-Joong Kim, Y-D. Kim, and Dong-Ho Lee, 2005. Scheduling for an arc welding robot considering heat-caused distortion. Journal of the Operational Research Society Vol. 56, No. 1, pp. 39-50. [Abstract]
    43. Geun-Cheol Lee and Y-D. Kim, 2004. A branch and bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness. International Journal of Production Research Vol. 42, No. 22, pp. 4731-4744. [Abstract]
    44. Y-D. Kim, Sang-Oh Shim, Soo-Bin Kim, Yong-Chan Choi, and Hang Mook Yoon, 2004. Parallel machine scheduling considering a job splitting property. International Journal of Production Research Vol. 42, No. 21, pp. 4531-4546. [Abstract]
    45. Seong-Hoon Choi and Y-D. Kim, 2004. Reallocation of Paths of ABR Services in a Multistage Interconnection Network (MIN)-type ATM Switch Network. European Journal of Operational Research Vol. 159, No. 1, pp. 207-218. [Abstract]
    46. Geon-Cheol Lee, Y-D. Kim, and Seong-Woo Choi, 2004. Bottleneck-focused scheduling for a hybrid flowshop. International Journal of Production Research Vol. 42, No. 1, pp. 165-181. [Abstract]
    47. Geun-Cheol Lee, Y-D. Kim, Jae-Gon Kim, and Seong-Hoon Choi, 2003. A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system. Journal of the Operational Research Society Vol. 54, No. 10, pp. 1038-1049. [Abstract]
    48. Y-D. Kim, Geun-Cheol Lee, Seung-Kil Lim, and Seong-Kook Choi, 2003. Tool requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint. International Journal of Production Research Vol. 41, No. 14, pp. 3339-3357. [Abstract]
    49. Y-D. Kim, Sang-Oh Shim, Bum Choi, and Hark Hwang, 2003. Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility. IEEE Transactions on Semiconductor Manufacturing Vol. 16, No 2, pp. 290-298. [Abstract]
    50. Jae-Gon Kim and Y-D. Kim, 2003. A Linear Programming-Based Algorithm for Floorplanning in VLSI Design. IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems Vol. 22, No. 5, pp. 584-592. [Abstract]
    51. Jung-Ug Kim, Y-D. Kim, and Sang-Oh Shim, 2002. Heuristic Algorithms for a Multi-Period Multi-Stop Transportation Planning Problem. Journal of the Operational Research Society Vol. 53, No. 9, pp. 1027-1037. [Abstract]
    52. Seong-Hoon Choi and Y-D. Kim, 2002. A traffic control algorithm for Clos network type ATM switches. Journal of the Operational Research Society Vol. 53, No. 7, pp. 783-791. [Abstract]
    53. Jun-Gyu Kang and Y-D. Kim, 2002. Stowage Planning in Maritime Container Transportation. Journal of the Operational Research Society Vol. 53, No. 4, pp. 415-426. [Abstract]
    54. Y-D. Kim, Geun-Cheol Lee, Seung-Kook Choi, and Seung-Kil Lim, 2001. Tool Requirements Planning in a Flexible Manufacturing System with an Automatic Tool Transporter. IEEE Transactions on Robotics and Automation Vol. 17, No. 6, pp. 795-804. [Abstract]
    55. Y-D. Kim, Jae-Gon Kim, Bum Choi, and Hyung-Un Kim, 2001. Production Scheduling in a Semiconductor Wafer Fabrication Facility Producing Multiple Product Types with Distinct Due Dates. IEEE Transactions on Robotics and Automation Vol. 17, No. 5, pp. 589-598. [Abstract]
    56. Y-D. Kim, Dong-Ho Lee, and Chi-Moon Yoon, 2001. Two-Stage Heuristic Algorithms for Part Input Sequencing in Flexible Manufacturing Systems. European Journal of Operational Research Vol. 133, No. 3, pp. 624-634. [Abstract]
    57. Seung-Kil Lim and Y-D. Kim, 2001. Plant location and procurement planning in knockdown production systems. Journal of the Operational Research Society Vol. 52, No. 3, pp. 271-282. [Abstract]
    58. Yong-Chan Choi and Y-D. Kim, 2001. Tool replacement policies for a machining center producing multiple types of products with distinct due dates. International Journal of Production Research Vol. 39, No.5, pp. 907-921. [Abstract]
    59. Jae-Gon Kim and Y-D. Kim, 2000. Layout planning for facilities with fixed shapes and input output points. International Journal of Production Research Vol. 38, No. 18, pp. 4635-4653. [Abstract]
    60. Keun-Chae Jeong and Y-D. Kim, 2000. Heuristics for selecting machines and determining buffer capacities in assembly systems. Computers and Industrial Engineering Vol. 38, No. 3, pp. 341-360. [Abstract]
    61. Moon-Won Park and Y-D. Kim, 2000. A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints. European Journal of Operational Research Vol. 123, No. 3, pp. 504-518. [Abstract]
    62. Jung-Ug Kim and Y-D. Kim, 2000. A Lagrangian relaxation approach to multi-period inventory/distribution planning. Journal of the Operational Research Society Vol. 51, No. 3, pp. 364-370. [Abstract]
    63. Geun-Cheol Lee and Y-D. Kim, 2000. Algorithms for adjusting shapes of departments in block layouts on the grid-based plane. Omega, The International Journal of Management Science Vol. 28, No. 1, pp. 111-122. [Abstract]
    64. Dong-Ho Lee and Y-D. Kim, 2000. Loading algorithms for flexible manufacturing systems with partially groupted machines. IIE Transactions Vol. 32, No. 1, pp. 33-47. [Abstract]
    65. Seung-Kil Lim and Y-D. Kim, 1999. An Integrated Approach to Dynamic Plant Location and Capacity Planning. Journal of the Operational Research Society Vol. 50, No. 12, pp. 1205-1216. [Abstract]
    66. Dong-Ho Lee and Y-D. Kim, 1999. Scheduling Algorithms for Flexible Manufacturing Systems with Partially Groupted Machines. Journal of Manufacturing Systems Vol. 18, No. 4, pp. 301-309. [Abstract]
    67. Jung-Ug Kim and Y-D. Kim, 1999. A Decomposition Approach to a Multi-Period Vehicle Scheduling Problem. Omega, The International Journal of Management Science Vol. 27, No. 4, pp. 421-430. [Abstract]
    68. Hong-Bae Jun, Y-D. Kim, and Hyo-Won Suh, 1999. Heuristics for a Tool Provisioning Problem in a Flexible Manufacturing System with an Automatic Tool Transporter. IEEE Transactions on Robotics and Automation Vol. 15, No. 3, pp. 488-496. [Abstract]
    69. Jae-Gon Kim and Y-D. Kim, 1999. A Branch and Bound Algorithm for Locating Input and Output Points of Departments on the Block Layout. Journal of the Operational Research Society Vol. 50, No. 5, pp. 517-525. [Abstract]
    70. Keun-Chae Jeong and Y-D. Kim, 1999. An Approximation Method for Performance Analysis of Assembly/Disassembly Systems with Parallel Machine Stations. IIE Transactions Vol. 31, No. 4, pp. 391-394. [Abstract]
    71. Moon-Won Park and Y-D. Kim, 1999. A Heuristic Algorithm for a Production Planning Problem in an Assembly System. Journal of the Operational Research Society Vol. 50, No. 2, pp. 138-147. [Abstract]
    72. Jae-Gon Kim and Y-D. Kim, 1998. A Space Partitioning Method for Facility Layout Problems with Shape Constraints. IIE Transactions Vol. 30, No. 10, pp. 947-957. [Abstract]
    73. Dong-Ho Lee and Y-D. Kim, 1998. Iterative Procedures for Multi-Peiord Order Selection and Loading Problems in Flexible Manufacturing Systems. International Journal of Production Research Vol. 36, No. 10, pp. 2653-2668. [Abstract]
    74. Keun-Chae Jeong and Y-D. Kim, 1998. A Real-Time Scheduling Mechanism for a Flexible Manufacturing System: Using Simulation and Dispatching Rules. International Journal of Production Research Vol. 36, No. 9, pp. 2609-2626. [Abstract]
    75. Y-D. Kim, Dong-Ho Lee, Jung-Ug Kim, and Hwan-Kyun Roh, 1998. A Simulation Study on Lot Release Control, Mask Scheduling and Batch Scheduling in Semiconductor Wafer Fabrication Facilities. Journal of Manufacturing Systems Vol. 17, No. 2, pp. 107-117. [Abstract]
    76. Dong-Ho Lee and Y-D. Kim, 1998. A Multi-Period Order Selection Problem in Flexible Manufacturing Systems. Journal of the Operational Research Society Vol. 49, No. 3, pp. 278-286. [Abstract]
    77. Moon-Won Park and Y-D. Kim, 1998. A Systematic Procedure for Setting Parameters in Simulated Annealing Algorithms. Computers and Operations Research Vol. 25, No. 3, pp. 207-217. [Abstract]
    78. Y-D. Kim, Jung-Ug Kim, Seung-Kil Lim, and Hong-Bae Jun, 1998. Due-date Based Scheduling and Control Policies in a Multi-Product Semiconductor Wafer Fabrication Process. IEEE Transactions on Semiconductor Manufacturing Vol. 11, No. 1, pp. 155-164. [Abstract]
    79. Keun-Chae Jeong and Y-D. Kim, 1998. Performance Analysis of Assembly/Disassembly Systems with Unreliable Machines and Random Processing Times. IIE Transactions Vol. 30, No. 1, pp. 41-53. [Abstract]
    80. Seung-Kil Lim and Y-D. Kim, 1998. Capacity Planning for Phased Implementation of Flexible Manufacturing Systems Under Budget Restrictions. European Journal of Operational Research Vol. 104, No. 1, pp. 175-186. [Abstract]
    81. Dong-Ho Lee, Seung-Kil Lim, Geun-Cheol Lee, Hong-Bae Jun, and Y-D. Kim, 1997. Multi-period part selection and loading problem in flexible manufacturing systems. Computers and Industrial Engineering, Vol. 33, Nos. 3-4, pp. 541-544. [Abstract]
    82. Keun-Chae Jeong and Y-D. Kim, 1997. Algorithms for determining capacities of individual buffers in assembly/disassembly systems. Computers and Industrial Engineering, Vol. 33, Nos. 3-4, pp. 605-608. [Abstract]
    83. Moon-Won Park and Y-D. Kim, 1997. Search heuristics for a parallel machine scheduling problem with ready times and due dates. Computers and Industrial Engineering, Vol. 33, Nos. 3-4, pp. 793-796. [Abstract]
    84. Y-D. Kim and C. A. Yano, 1997. Impact of Throughput-based Objectives and Machine Grouping Decisions on the Short-Term Performance of Flexible Manufacturing Systems. International Journal of Production Research, Vol. 35, No. 12, pp. 3303-3322. [Abstract]
    85. Hwan-Kyun Roh and Y-D. Kim, 1997. Due-date Based Loading and Scheduling Methods for a Flexible Manufacturing System with an Automatic Tool Transporter. International Journal of Production Research, Vol. 35, No. 11, pp. 2989-3004. [Abstract]
    86. Jung-Hee Cho and Y-D. Kim, 1997. A Simulated Annealing Algorithm for Resource Constrained Project Scheduling Problems. Journal of the Operational Research Society, Vol. 48, No. 7, pp. 736-744. [Abstract]
    87. Jeong-Ug Kim and Y-D. Kim, 1996. Simulated Annealing and Genetic Algorithms for Scheduling Products with Multi-level Product Structure. Computers and Operations Research Vol. 23, No. 9, pp. 857-868. [Abstract]
    88. Y-D. Kim, Hyeong-Gyu Lim, and Moon-Won Park, 1996. Search Heuristics for a Flowshop Scheduling Problem in a Printed Circuit Board Assembly Process. European Journal of Operational Research Vol. 91, No. 1, pp. 124-143. [Abstract]
    89. Dong-Ho Lee and Y-D. Kim, 1996. Part-mix Allocation in a Hybrid Manufacturing System with a Flexible Manufacturing Cell and a Conventional Jobshop. International Journal of Production Research Vol. 34, No. 5, pp. 1347-1360. [Abstract]
    90. Jae-Kwan Lee and Y-D. Kim, 1996. Search Heuristics for Resource Constrained Project Scheduling. Journal of the Operational Research Society Vol. 47, No. 5, pp. 678-689. [Abstract]
    91. Y-D. Kim, 1995. Minimizing Total Tardiness in Permutation Flowshops. European Journal of Operational Research Vol. 85, No. 3, pp. 541-551.
    92. Jae-Youp Kim and Y-D. Kim, 1995. Graph Theoretic Heuristics for Unequal-sized Facility Layout Problems. Omega, The International Journal of Management Science Vol. 23, No. 4, pp. 391-401.
    93. Moon-Won Park. and Y-D. Kim, 1995. A Heuristic for Setting Up a Flexible Assembly System. International Journal of Production Research Vol. 33, No. 8, pp. 2295-2310. [Abstract]
    94. Chang-Yong Song, Hark Hwang, and Y-D. Kim, 1995. Heuristic Algorithm for the Tool Movement Policy in Flexible Manufacturing Systems. Journal of Manufacturing Systems Vol. 14, No. 3, pp. 160-168.
    95. Y-D. Kim, 1995. A Backward Approach in List Scheduling Algorithms for Multi-Machine Tardiness Problems. Computers and Operations Research. Vol. 22, No. 3, pp. 307-319. [Abstract]
    96. Y-D. Kim and C. A. Yano, 1994. Minimizing Mean Tardiness and Earliness in Single Machine Scheduling Problems with Unequal Due-Dates. Naval Research Logistics Vol. 41, No. 7, pp. 913-933. [Abstract]
    97. Min Hee Kim and Y-D. Kim, 1994. Simulation Based Real Time Scheduling in a Flexible Manufacturing System. Journal of Manufacturing Systems, Vol. 13, No. 2, pp. 85-93. [Abstract]
    98. Y-D. Kim and C. A. Yano, 1994. A Due Date Based Approach to Part Type Selection in Flexible Manufacturing Systems. International Journal of Production Research, Vol. 32, No. 5, pp. 1027-1043. [Abstract]
    99. Y-D. Kim and C. A. Yano, 1994. A New Branch and Bound algorithm for Loading Problems in Flexible Manufacturing Systems. International Journal of Flexible Manufacturing Systems, Vol. 6, No. 4, pp. 361-382.
    100. Hark Hwang, Dae Bum Kim, and Y-D. Kim, 1993. Multiproduct Economic Lot Size Models with Investment Costs for Setup Reduction and Quality Improvement. International Journal of Production Research, Vol. 31, No. 3, pp. 691-703.
    101. Y-D. Kim, 1993. A New Branch and Bound Algorithm for Minimizing Mean Tardiness in Two-Machine Flowshops. Computers and Operations Research, Vol. 20, No. 4, pp. 391-401. [Abstract]
    102. Y-D. Kim, 1993. A Study on Surrogate Objectives for Loading a Certain Type of Flexible Manufacturing Systems. International Journal of Production Research, Vol. 31, No. 2, pp. 381-392. [Abstract]
    103. Y-D. Kim and C. A. Yano, 1993. Heuristic Approaches for Loading Problems in Flexible Manufacturing Systems. IIE Transactions, Vol. 25, No. 1, pp. 26-39.
    104. Y-D. Kim, 1993. Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness. Journal of the Operational Research Society, Vol. 44, No. 1, pp. 19-28. [Abstract]
    105. Y-D. Kim and C. A. Yano, 1992. An Iterative Approach to System Setup Problems in Flexible Manufacturing Systems. International Journal of Flexible Manufacturing Systems, Vol. 4, No. 2, pp. 183-209. [Abstract]
    106. C. A. Yano and Y-D. Kim, 1991. Algorithms for a Class of Single-Machine Weighted Tardiness and Earliness Problems. European Journal of Operational Research, Vol. 52, No. 2, pp. 167-178. [Abstract]
    107. Y-D. Kim, 1990. A Comparison of Dispatching Rules for Job Shops with Multiple Identical Jobs and Alternative Routeings. International Journal of Production Research, Vol. 28, No. 5, pp. 953-962.
    108. Y-D. Kim, 1987. On the Superiority of a Backward Approach in List Scheduling Algorithms for Multi-Machine Makespan Problems. International Journal of Production Research , Vol. 25, No. 12, pp. 1751-1759. [Abstract]

      Papers in Other International Journals

    109. Dong-Guen Kim, Y-D. Kim, and Taesik Lee, 2012. Heuristics for locating two types of public health-care facilities. Industrial Engineering and Management Systems,Vol. 11, No. 2, pp. 202-214. doi:10.7232/iems.2012.11.2.202 [Abstract]
    110. Si-Young Lee, Y-D. Kim, and Ho-Joo Lee, 2009. Heuristic Algorithm for a Military Training Timetabling Problem. Asia Pacific Management Review, Vol. 14, No. 3, pp. 289-299. [Abstract]
    111. Jae-Gon Kim, Y-D. Kim, and Dong-Ho Lee, 2000. Simulated annealing algorithms for locating pickup and delivery points in an automated guided vehicle system. Journal of Engineering Valuation and Cost Analysis, Vol. 3, No. 4, pp. 205-215. [Abstract]

    Refereed journal articles (Korean)

    1. Choi Seong-Woo, Lim Tae-Kyu, and Y-D. Kim, 2010. Heuristics for Scheduling Wafer Lots at the Deposition Workstation in a Semiconductor Wafer Fab. Journal of the Korean Institute of Industrial Engineers, Vol. 36, No. 2, pp. 125-137.
    2. Byung-Jun Joo, Y-D. Kim, and June-Young Bang, 2009. A Scheduling Algorithm for Workstations with Limited Waiting Time Constraints in a Semiconductor Wafer Fabrication Facility. Journal of the Korean Institute of Industrial Engineers, Vol. 35, No. 4, pp. 266-279.
    3. Ho-Joo Lee and Y-D. Kim, 2004. Scheduling for military training of serials with partial precedence relationships based on the assignment problem. Journal of the Korean Institute of Military Science and Technology, Vol. 7, No. 3, pp. 77-83.
    4. Moon-Won Park and Y-D. Kim, 1998. Algorithms for Production Planning and Scheduling in an Assembly System Operating on a Make-to-Order Basis. Journal of the Korean Institute of Industrial Engineers, Vol. 24, No. 3, pp. 345-357. [Abstract]
    5. Seung-Kil Lim and Y-D. Kim, 1998. A Lagrangian Relaxation Approach to Capacity Planning for a Manufacturing System with Flexible and Dedicated Machines. Journal of the Korean Operations Research and Management Science Society Vol. 23, No. 2, pp. 47-65.
    6. Jae-Gon Kim, Geun-Cheol Lee, and Y-D. Kim, 1997. A Study on Facility Layout Planning Using Graph Theory. Journal of the Korean Institute of Industrial Engineers, Vol. 23, No. 2, pp. 359-370.
    7. Sang-Sil Park and Y-D. Kim, 1995. A Heuristic Algorithm for Tool Loading and Scheduling in a Flexible Manufacturing System with an Automatic Tool Transporter. Journal of the Korean Institute of Industrial Engineers, Vol. 21, No. 1, pp. 119-135.

    Research Projects

    1. A Study on Due-date Based Part Type Selection Methods for Flexible Manufacturing Systems. Korea Science and Engineering Foundation (KOSEF).
    2. Development of a Design, Real-time Scheduling and Control System for Semiconductor Manufacturing Systems, Korean Ministry of Science and Technology (MOST).
    3. Logical modeling for Management Software, Daewoo Information Systems Ltd.
    4. A Study on Flowshop Scheduling Minimizing Total Tardiness, KOSEF.
    5. Development of a Production Planning and Scheudling System for Semiconductor Manufacturing Systems, MOST.
    6. Development of a lot dispatching algorithm for automated photolithography bay, LG Semiconductor Industries Ltd.
    7. Input Policy and Scheduling for Photolithography stations in Semiconductor Wafer Fabrication Process, MOST.
    8. Production Planning and Scheduling in Assembly Systems with Parallel-machine Workstation, Sanhak Foundation.
    9. A Study on Facility Layout Planning using Graph Theory, Korea Research Foundation.
    10. Development of Production Planning Modue for IAE-FMS, Institute for Advanced Engineering.
    11. A Study on Design of Assembly Systems, KOSEF.
    12. An Algorithm for Multi-Period Inventory/Routing Problems, Korea Research Foundation.
    13. Development of Simulation Model for Design of a Multi ATC ATM Switch, Electonics and Telecommunications Research Institute.
    14. Development of an Economic Evaluation Model for Internet-related Business, Electonics and Telecommunications Research Institute.
    15. Production planning and progress control in a semiconductor wafer fabrication facility for application specific integrated circuits, KOSEF.
    16. Production scheduling for advanced planning and scheduling (APS) in a printed circuit board manufacturing plant, LG Electonics Inc.
    17. Production planning and scheduling in a leadframe manufacturing plant, Aju Exim Inc.
    18. Development of a simulation model and a scheduler for optimal operation of a semiconductor fabrication facility, Samsung Electronics.

    Go To Dept. of IE, KAIST Home Page

    Go To FMS/PM Lab Home Page